use cases industrial

Industrial waste treatment plant in Stigsnæs, Denmark

EnerTwin connected to a sloptank and in combination with a 32 kW heat pump, to separate oil and water. The EnerTwin replaced an old heating oil fired boiler and is installed in cascade with a heat pump for optimum efficiency.

Slop oil separation capacity has increased towards 8.000 to 10.000 m3/year.
Pay back of full installation (heat pump + EnerTwin) within 2.4 years, due to higher efficiency and electricity production.
More than CO2 emissions reduced by 10 tonnes of per year.

Read more...

Plant Skælskør Denmark