Industrial waste treatment plant in Stigsnæs, Denmark

EnerTwin connected to a sloptank and in combination with a 32 kW heat pump, to separate oil and water. The EnerTwin replaced an old heating oil fired boiler and is installed in cascade with a heat pump for optimum efficiency.

Slop oil separation capacity has increased towards 8.000 to 10.000 m3/year.
Pay back of full installation (heat pump + EnerTwin) within 2.4 years, due to higher efficiency and electricity production.
More than CO2 emissions reduced by 10 tonnes of per year.

Read more...

Plant Skælskør Denmark

Installation company in Neuenrade, DE

CCHP installation: the EnerTwin is connected with an absorption chiller, allowing both the production of heat and cooling.